IAC logo
IAC Assessment: MO0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1990
Principal Product CHARCOAL & LIGHTER FLUID
NAICS n/a
SIC 2861 - Gum And Wood Chemicals
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 80,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,850 2,053,927 kWh $0.05
LPG $164,634 53,861 MMBtu $3.06
Fuel Oil #2 $2,720 560 MMBtu $4.86
TOTAL ENERGY COSTS $260,204
RECOMMENDED SAVINGS* $32,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,262
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,439
Cost:
$3,511
- - $2,439 800 -
-
kWh
$2,439
800
MMBtu
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$19,712
Cost:
$9,886
$19,712 436,401 - - $19,712
436,401
kWh
-
-
MMBtu
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$6,935
Cost:
$351
- - $6,935 2,274 -
-
kWh
$6,935
2,274
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,436
Cost:
$3,500
$2,436 53,927 - - $2,436
53,927
kWh
-
-
MMBtu
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$585
Cost:
$175
- - $585 192 -
-
kWh
$585
192
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$90
Cost:
$72
$90 2,052 - - $90
2,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,197
Cost:
$17,495
$22,238 492,380 $9,959 3,266 $22,238
492,380
kWh
$9,959
3,266
MMBtu
TOTAL IMPLEMENTED Savings:
$25,262
Cost:
$17,144
$22,238 492,380 $3,024 992 $22,238
492,380
kWh
$3,024
992
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG