IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72,728

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0073 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $15,180 $3,000 Implemented
CO0073 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,061 $200 Implemented
CO0073 # 05 Y:1986 05 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,212 $800 Implemented
CO0073 # 06 Y:1986 06 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,876 $4 Implemented
CO0073 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,183 $0 Implemented
CO0073 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $999 $300 Implemented
CO0073 # 10 Y:1986 10 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $382 $50 Implemented
CO0073 # 11 Y:1986 11 1986 INSTALL SET-BACK TIMERS $3,538 $1,879 Implemented
CO0074 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,038 $4,650 Implemented
CO0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $16,456 $0 Implemented
CO0074 # 05 Y:1986 05 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,018 $0 Implemented
CO0074 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,296 $400 Implemented
CO0074 # 08 Y:1986 08 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,810 $0 Implemented
CO0074 # 09 Y:1986 09 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,571 $500 Implemented
CO0074 # 12 Y:1986 12 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $132 Implemented
CO0071 # 01 Y:1986 01 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $7,253 $150 Implemented
CO0071 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,654 $300 Implemented
CO0071 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $4,524 $0 Implemented
CO0071 # 07 Y:1986 07 1986 REPAIR AND ELIMINATE STEAM LEAKS $4,895 $300 Implemented
CO0071 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,811 $150 Implemented
CO0071 # 09 Y:1986 09 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $2,116 $820 Implemented
CO0071 # 10 Y:1986 10 1986 INSULATE BARE EQUIPMENT $493 $560 Implemented
CO0071 # 11 Y:1986 11 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,185 $450 Implemented
GT0300 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,458 $2,802 Implemented
GT0300 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,023 $9,962 Implemented