IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,780

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0268 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,482 $250 Implemented
TN0268 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $895 $250 Implemented
AT0033 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $360 Implemented
AT0033 # 03 Y:1986 03 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $250 Implemented
GT0276 # 03 Y:1986 03 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,268 $1,500 Implemented
GT0276 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,040 $15,677 Implemented
GT0276 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $392 $863 Implemented
CO0052 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $300 Implemented
CO0052 # 02 Y:1986 02 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,221 $2,500 Implemented
CO0052 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $763 $1,500 Implemented
CO0052 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $300 Implemented
CO0052 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $3,842 $0 Implemented
CO0052 # 08 Y:1986 08 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $73 $30 Implemented
CO0052 # 09 Y:1986 09 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,902 $4,000 Implemented
CO0052 # 10 Y:1986 10 1986 INSTALL SET-BACK TIMERS $1,267 $657 Implemented
KU0182 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,883 $10,000 Implemented
KU0182 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $700 Implemented
KU0182 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $3,144 $3,000 Implemented
KU0182 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $882 $2,000 Implemented
KU0182 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $160 $0 Implemented
KU0182 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $6,002 $4,500 Implemented
KU0183 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $4,326 $4,279 Implemented
KU0183 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,213 $0 Implemented
KU0183 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $2,059 $1,500 Implemented
KU0183 # 05 Y:1986 05 1986 OPTIMIZE PLANT POWER FACTOR $1,423 $2,500 Implemented