IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,780

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0165 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,934 $4,600 Implemented
UD0165 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,435 $0 Implemented
UD0165 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,848 $1,500 Implemented
OK0165 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $63 Implemented
OK0165 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76 $77 Implemented
OK0165 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $389 $385 Implemented
OK0165 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,595 $1,005 Implemented
OK0166 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $5,377 $2,398 Implemented
OK0166 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $950 $624 Implemented
OK0168 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $317 $200 Implemented
OK0168 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $831 $140 Implemented
OK0168 # 04 Y:1985 04 1985 REPAIR AND ELIMINATE STEAM LEAKS $9,402 $350 Implemented
OK0168 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $358 $468 Implemented
OK0168 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $126 Implemented
OK0168 # 07 Y:1985 07 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $595 $760 Implemented
OK0168 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,999 $1,400 Implemented
OK0169 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,330 $292 Implemented
OK0169 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,030 $1,500 Implemented
OK0169 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $231 $842 Implemented
OK0169 # 04 Y:1985 04 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $245 $228 Implemented
OK0169 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $62 $120 Implemented
OK0169 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $4,930 $4,780 Implemented
OK0169 # 07 Y:1985 07 1985 INSTALL SET-BACK TIMERS $2,001 $222 Implemented
OK0169 # 08 Y:1985 08 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $860 $631 Implemented
OK0169 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $23,457 $1,100 Implemented