IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,780

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0023 # 10 Y:1985 10 1985 USE COMPRESSOR AIR FILTERS $479 $120 Implemented
ST0024 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Implemented
ST0024 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $893 $112 Implemented
ST0024 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,678 $0 Implemented
ST0024 # 09 Y:1985 09 1985 INSULATE BARE EQUIPMENT $44 $26 Implemented
ST0024 # 10 Y:1985 10 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,186 $1,900 Implemented
ST0024 # 11 Y:1985 11 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,038 $2,186 Implemented
ST0024 # 13 Y:1985 13 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,126 $76 Implemented
ST0025 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,196 $216 Implemented
ST0025 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,372 $1,025 Implemented
ST0025 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,350 $537 Implemented
ST0025 # 06 Y:1985 06 1985 RECOVER AND REUSE COOLING WATER $700 $1,000 Implemented
ST0025 # 08 Y:1985 08 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,777 $1,900 Implemented
ST0025 # 09 Y:1985 09 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $25,374 $0 Implemented
TN0247 # 01 Y:1985 01 1985 REDESIGN PROCESS $8,108 $2,000 Implemented
TN0247 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,753 $135 Implemented
TN0247 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $808 $500 Implemented
TN0248 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,966 $375 Implemented
TN0248 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,354 $4,000 Implemented
TN0248 # 03 Y:1985 03 1985 COVER OPEN TANKS $1,628 $800 Implemented
TN0248 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,044 $750 Implemented
TN0248 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $967 $0 Implemented
TN0248 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $500 Implemented
TN0249 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $3,085 $583 Implemented
TN0249 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,598 $0 Implemented