IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,292

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0020 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $64 Implemented
ST0020 # 08 Y:1985 08 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,102 $600 Implemented
ST0020 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $723 $278 Implemented
ST0009 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $201 $537 Implemented
ST0009 # 03 Y:1984 03 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $50 $0 Implemented
ST0009 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
ST0009 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $40 $50 Implemented
ST0009 # 08 Y:1984 08 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,149 $0 Implemented
ST0010 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,173 $0 Implemented
ST0010 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,071 $429 Implemented
ST0010 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $930 $0 Implemented
ST0010 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,423 $74 Implemented
ST0010 # 09 Y:1984 09 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $150 Implemented
ST0010 # 11 Y:1984 11 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $910 $537 Implemented
ST0010 # 13 Y:1984 13 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $32 Implemented
ST0011 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,259 $0 Implemented
ST0011 # 03 Y:1984 03 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,083 $190 Implemented
ST0011 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $2,290 Implemented
ST0011 # 05 Y:1984 05 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
ST0011 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $93 $45 Implemented
ST0011 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $56 Implemented
ST0011 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $435 Implemented
ST0011 # 09 Y:1984 09 1984 RECOVER WASTE HEAT FROM EQUIPMENT $668 $500 Implemented
ST0007 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,031 $1,461 Implemented
ST0007 # 05 Y:1984 05 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,694 $50 Implemented