IAC logo
IAC Assessment: ST0013
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0013
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product WEB & SHEET FED PRINTING
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $245,465 3,203,107 kWh $0.08
Natural Gas $77,280 12,555 MMBtu $6.16
TOTAL ENERGY COSTS $322,745
RECOMMENDED SAVINGS* $28,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,237
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,678
Cost:
$56
$7,678 100,234 - - $7,678
100,234
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,468
Cost:
$1,367
$4,468 58,324 - - $4,468
58,324
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,533
Cost:
$700
- - $2,533 420 -
-
kWh
$2,533
420
MMBtu
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$766
Cost:
$880
- - $766 127 -
-
kWh
$766
127
MMBtu
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$964
Cost:
-
$831 10,844 $133 22 $831
10,844
kWh
$133
22
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,073
Cost:
$400
$1,616 21,102 $(-543) (-90) $1,616
21,102
kWh
$(-543)
(-90)
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,713
Cost:
$178
$1,325 17,292 $2,388 396 $1,325
17,292
kWh
$2,388
396
MMBtu
08: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$1,042
Cost:
$42
$180 2,345 $862 143 $180
2,345
kWh
$862
143
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,783
Cost:
$23,000
- - $5,783 959 -
-
kWh
$5,783
959
MMBtu
TOTAL RECOMMENDED Savings:
$28,020
Cost:
$26,623
$16,098 210,141 $11,922 1,977 $16,098
210,141
kWh
$11,922
1,977
MMBtu
TOTAL IMPLEMENTED Savings:
$22,237
Cost:
$3,623
$16,098 210,141 $6,139 1,018 $16,098
210,141
kWh
$6,139
1,018
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas