Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
1,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0022 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $27,958 | $5,100 | Implemented |
AS0022 # 02 Y:1991 | 02 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,409 | $30,000 | Implemented |
AS0022 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,189 | $2,775 | Implemented |
AS0022 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,153 | $1,500 | Implemented |
AS0022 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $1,100 | Implemented |
AS0022 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $2,580 | $2,325 | Implemented |
AS0022 # 07 Y:1991 | 07 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,326 | $50,000 | Implemented |
AS0022 # 08 Y:1991 | 08 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $691 | $550 | Implemented |
AS0022 # 09 Y:1991 | 09 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $448 | $515 | Implemented |
AS0022 # 10 Y:1991 | 10 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $521 | $0 | Implemented |
AS0022 # 11 Y:1991 | 11 | 1991 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $37,471 | $100,000 | Implemented |
AS0021 # 01 Y:1991 | 01 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,378 | $0 | Implemented |
AS0021 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,782 | $18,179 | Implemented |
AS0021 # 03 Y:1991 | 03 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,879 | $0 | Implemented |
AS0021 # 04 Y:1991 | 04 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,913 | $35,000 | Implemented |
AS0021 # 05 Y:1991 | 05 | 1991 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $90,586 | $400,000 | Implemented |
AS0021 # 06 Y:1991 | 06 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $17,386 | $18,000 | Implemented |
AS0021 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,885 | $1,000 | Implemented |
AS0021 # 08 Y:1991 | 08 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,180 | $1,760 | Implemented |
AS0021 # 09 Y:1991 | 09 | 1991 | IMPROVE LUBRICATION PRACTICES | $7,796 | $0 | Implemented |
AS0021 # 10 Y:1991 | 10 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,246 | $18,000 | Implemented |
AS0021 # 11 Y:1991 | 11 | 1991 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $101,612 | $1,050,000 | Implemented |
AS0019 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,610 | $0 | Implemented |
AS0019 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95 | $155 | Implemented |
AS0019 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $140 | $150 | Implemented |