Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,681
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0199 # 08 Y:2010 | 08 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,552 | $4,531 | Implemented |
MI0198 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,683 | $55,919 | Implemented |
MI0198 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,892 | $2,000 | Implemented |
MI0198 # 04 Y:2010 | 04 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,048 | $13,338 | Implemented |
MI0198 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $5,576 | $14,400 | Implemented |
MI0198 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,870 | $1,210 | Implemented |
MI0198 # 08 Y:2010 | 08 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,407 | $40 | Implemented |
MI0197 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,774 | $1,210 | Implemented |
MI0197 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,187 | $180 | Implemented |
MI0197 # 07 Y:2010 | 07 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,983 | $2,040 | Implemented |
UF0436 # 01 Y:2010 | 01 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $493 | $388 | Implemented |
UF0436 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,947 | $350 | Implemented |
UF0436 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,376 | $1,782 | Implemented |
UF0436 # 07 Y:2010 | 07 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $811 | $895 | Implemented |
UF0436 # 08 Y:2010 | 08 | 2010 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $19,232 | $26,795 | Implemented |
MI0196 # 01 Y:2010 | 01 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $157,910 | $102,500 | Implemented |
MI0196 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $108,082 | $2,000 | Implemented |
MI0196 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,243 | $1,210 | Implemented |
UF0435 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,247 | $18,650 | Implemented |
UF0435 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,927 | $9,651 | Implemented |
UF0435 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $634 | $20 | Implemented |
MI0195 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $50,578 | $6,600 | Implemented |
MI0195 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,044 | $1,210 | Implemented |
MI0195 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,854 | $2,300 | Implemented |
MI0195 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,905 | $40 | Implemented |