IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,234

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0228 # 14 Y:2000 14 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $39,000 $6,000 Implemented
HO0228 # 17 Y:2000 17 2000 REDUCE OR ELIMINATE WASTE $8,250 $0 Implemented
HO0219 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,633 $18,330 Implemented
HO0219 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,714 $5,000 Implemented
HO0219 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $3,386 $1,515 Implemented
HO0219 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,271 $1,500 Implemented
HO0219 # 06 Y:2000 06 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,935 $8,000 Implemented
HO0219 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,102 $4,641 Implemented
HO0218 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,368 $41,546 Implemented
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented
HO0218 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $4,499 $2,640 Implemented
HO0218 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,069 $0 Implemented
HO0218 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $37,179 $0 Implemented
MA0451 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $680 $0 Implemented
HO0213 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $931 $0 Implemented
HO0206 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,885 $30,185 Implemented
HO0206 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,390 $2,840 Implemented
HO0206 # 05 Y:1999 05 1999 MOVE PRODUCT USING MECHANICAL MEANS $1,560 $500 Implemented
HO0206 # 07 Y:1999 07 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $7,800 $32,000 Implemented
HO0206 # 10 Y:1999 10 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $4,155 $7,500 Implemented
HO0206 # 12 Y:1999 12 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,403 $0 Implemented
HO0199 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,100 $0 Implemented
HO0199 # 03 Y:1999 03 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,627 $1,300 Implemented
HO0199 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,503 $750 Implemented
HO0199 # 05 Y:1999 05 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $2,808 $5,000 Implemented