IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,400

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0120 # 01 Y:1982 01 1982 INSTALL TIMERS AND/OR THERMOSTATS $7,382 $4,000 Implemented
GT0120 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,894 $975 Implemented
GT0121 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,280 $2,000 Implemented
GT0116 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $400 Implemented
GT0116 # 02 Y:1982 02 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,712 $0 Implemented
GT0116 # 03 Y:1982 03 1982 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,841 $0 Implemented
GT0116 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,272 $150 Implemented
GT0125 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,931 $1,900 Implemented
GT0125 # 02 Y:1982 02 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,067 $400 Implemented
GT0125 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,124 $6,215 Implemented
GT0125 # 04 Y:1982 04 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $648 $0 Implemented
GT0125 # 05 Y:1982 05 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $748 $359 Implemented
GT0112 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,062 $2,400 Implemented
GT0112 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $973 $506 Implemented
GT0112 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,411 $5,029 Implemented
GT0112 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,125 $1,500 Implemented
GT0112 # 05 Y:1982 05 1982 USE OPTIMUM THICKNESS INSULATION $3,585 $5,294 Implemented
GT0112 # 06 Y:1982 06 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,835 $0 Implemented
GT0112 # 07 Y:1982 07 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $656 $0 Implemented
GT0112 # 08 Y:1982 08 1982 RECOVER WASTE HEAT FROM EQUIPMENT $27,024 $31,500 Implemented
GT0110 # 02 Y:1982 02 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $842 $1,110 Implemented
GT0110 # 03 Y:1982 03 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,455 $3,730 Implemented
GT0111 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $814 $0 Implemented
GT0111 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $597 Implemented
GT0111 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $25 Implemented