IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0682 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $104,297 $70,000 Not Implemented
OR0682 # 02 Y:2017 02 2017 REPLACE BOILER $4,289 $23,625 Not Implemented
OR0682 # 03 Y:2017 03 2017 REPLACE BOILER $1,937 $9,815 Not Implemented
OR0681 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,360 $532 Not Implemented
OR0681 # 02 Y:2017 02 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,375 $2,995 Not Implemented
OR0681 # 01 Y:2017 01 2017 USE OPTIMUM TEMPERATURE $7,040 $0 Not Implemented
BS0092 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,692 $3,161 Not Implemented
BS0092 # 03 Y:2016 03 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,842 $464 Not Implemented
BS0092 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,891 $3,900 Not Implemented
BS0092 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $12,593 $2,530 Not Implemented
BS0092 # 01 Y:2016 01 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $84,096 $646,400 Not Implemented
BS0092 # 04 Y:2016 04 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,190 $6,640 Not Implemented
OR0680 # 03 Y:2017 03 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000 Implemented
OR0680 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,714 $13,620 Not Implemented
OR0680 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,852 $150,000 Not Implemented
OR0680 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,732 $3,529 Implemented
OR0680 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392 Implemented
BS0045 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $986 $1,373 Not Implemented
BS0045 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,833 $5,036 Not Implemented
BS0045 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,790 $13,052 Not Implemented
BS0045 # 03 Y:2014 03 2014 PAY UTILITY BILLS ON TIME $7,864 $122 Not Implemented
BS0045 # 02 Y:2014 02 2014 USE OPTIMUM THICKNESS INSULATION $1,553 $2,600 Not Implemented
BS0045 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $6,415 $10,400 Not Implemented
BS0044 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $9,004 $6,600 Implemented
BS0044 # 04 Y:2014 04 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,828 $9,000 Implemented