IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,305

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0365 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,558 $75,320 n/a
MZ0365 # 05 Y:2024 05 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $267,134 $875,396 n/a
MZ0365 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,036 $6,500 n/a
MZ0365 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,741 $805 n/a
MZ0365 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,949 $1,000 n/a
MZ0365 # 04 Y:2024 04 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $96 $520 n/a
IC0299 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,981 $847 n/a
IC0299 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $89,084 $34,144 n/a
IC0299 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,790 $31,894 n/a
IC0299 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $642 n/a
IC0299 # 06 Y:2024 06 2024 BURN A LESS EXPENSIVE GRADE OF FUEL $447,899 $23,503 n/a
IC0299 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $263,888 $200,000 n/a
IC0299 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,372 $2,712 n/a
IC0299 # 07 Y:2024 07 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,379 $8,310 n/a
IC0299 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $23,893 $3,458 n/a
IC0292 # 03 Y:2024 03 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,811 $17,313 Not Implemented
IC0292 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $19,216 $10,388 Implemented
IC0292 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $434 $0 Implemented
IC0292 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,786 $0 Implemented
IC0292 # 08 Y:2024 08 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,681 $163,749 Not Implemented
IC0292 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,518 $9,738 Implemented
IC0292 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,838 $0 Not Implemented
IC0292 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,075 $1,202,972 Not Implemented
NL0076 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,084 $35 Not Implemented
NL0076 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,345 $20,000 Not Implemented