Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,908
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0332 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,248 | $81,420 | n/a |
IC0332 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,189 | $1,828 | n/a |
IC0332 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $82 | $137 | n/a |
IC0332 # 05 Y:2025 | 05 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $1,821 | $2,450 | n/a |
IC0332 # 03 Y:2025 | 03 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $254 | $800 | n/a |
IC0332 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $593 | $3,461 | n/a |
IC0332 # 07 Y:2025 | 07 | 2025 | REPLACE BOILER | $17,004 | $104,568 | n/a |
MZ0381 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $428,798 | $4,387,498 | n/a |
MZ0381 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,000 | $19,875 | n/a |
MZ0381 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $318,110 | $818,754 | n/a |
MZ0381 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $24,783 | $28,280 | n/a |
MZ0381 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,828 | $0 | n/a |
MZ0381 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $87,568 | $395,000 | n/a |
MZ0380 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,784 | $447,535 | n/a |
MZ0380 # 07 Y:2025 | 07 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,164 | $0 | n/a |
MZ0380 # 11 Y:2025 | 11 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53,306 | $145,600 | n/a |
IP7027 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $672 | $3,229 | n/a |
MZ0380 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $105,308 | $41,000 | n/a |
IP7027 # 01 Y:2025 | 01 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $715 | $77 | n/a |
MZ0380 # 05 Y:2025 | 05 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,506 | $19,860 | n/a |
MZ0380 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,856 | $3,000 | n/a |
IP7027 # 03 Y:2025 | 03 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,551 | $11,300 | n/a |
MZ0380 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $4,713 | $2,400 | n/a |
MZ0380 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $53,986 | $195,000 | n/a |
IP7027 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,297 | $1,750 | n/a |