Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
2,515
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0673 # 11 Y:2024 | 11 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $470 | $887 | n/a |
WV0673 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,643 | $75,157 | n/a |
WV0673 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $6,139 | $11,569 | n/a |
WV0673 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,359 | $6,620 | n/a |
WV0673 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $4,399 | $2,317 | n/a |
WV0673 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $55,596 | $232,663 | n/a |
WV0673 # 07 Y:2024 | 07 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,917 | $5,832 | n/a |
WV0673 # 13 Y:2024 | 13 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $177 | $688 | n/a |
WV0673 # 10 Y:2024 | 10 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $613 | $3,000 | n/a |
WV0673 # 08 Y:2024 | 08 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,740 | $1,420 | n/a |
WV0673 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,382 | $16,575 | n/a |
WV0673 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $179 | $80 | n/a |
WV0673 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $560 | n/a |
DL0242 # 04 Y:2024 | 04 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,290 | $11,200 | n/a |
DL0242 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,258 | $0 | n/a |
DL0242 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,703 | $0 | n/a |
DL0242 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,049 | $191 | n/a |
DL0242 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,043 | $0 | n/a |
WV0665 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $2,096 | $1,417 | Implemented |
WV0665 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $375 | Implemented |
WV0665 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,272 | $1,500 | Implemented |
WV0665 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,064 | $3,296 | Implemented |
WV0665 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $9,140 | Not Implemented |
WV0665 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $150 | Implemented |
WV0665 # 08 Y:2024 | 08 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,306 | $1,070 | Implemented |