IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0266 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,950 $865 Not Implemented
UA0266 # 04 Y:2022 04 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,089 $188 Not Implemented
UA0266 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,871 $22,132 Not Implemented
UA0266 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $894 $558 Not Implemented
UL2216 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,227 $10,882 Implemented
UL2216 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,196 $2,730 Implemented
UL2216 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,028 $0 Implemented
UL2216 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $960 Implemented
UL2216 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $67,103 $45,461 Implemented
UL2216 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,380 $170,625 Not Implemented
UL2216 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,446 $39,000 Not Implemented
UL2216 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,561 $1,213,600 Not Implemented
UL2216 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $77,523 $1,418,559 Not Implemented
UL2216 # 10 Y:2022 10 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,758 $500 Not Implemented
UL2216 # 11 Y:2022 11 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,497 $40,000 Not Implemented
AS0535 # 01 Y:2022 01 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,534 $44,427 Implemented
AS0535 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,698 $7,427 Not Implemented
AS0535 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,081 $17,428 Not Implemented
AS0535 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $539 $156 Implemented
SU0528 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $276 $0 Not Implemented
SU0528 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,262 $0 Not Implemented
SU0528 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,193 $100 Not Implemented
SU0528 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $6,434 $414 Not Implemented
SU0528 # 05 Y:2022 05 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,343 $660 Not Implemented
SU0528 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,717 $2,594 Not Implemented