Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0217 # 10 Y:1987 | 10 | 1987 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $19,971 | $15,800 | Not Implemented |
KU0218 # 01 Y:1987 | 01 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $27,756 | $3,000 | Not Implemented |
KU0218 # 02 Y:1987 | 02 | 1987 | IMPROVE LUBRICATION PRACTICES | $24,382 | $0 | Not Implemented |
KU0218 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,063 | $25,287 | Implemented |
KU0218 # 04 Y:1987 | 04 | 1987 | INSULATE BARE EQUIPMENT | $5,457 | $2,500 | Implemented |
KU0218 # 05 Y:1987 | 05 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,325 | $500 | Implemented |
KU0218 # 06 Y:1987 | 06 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,257 | $400 | Not Implemented |
KU0218 # 07 Y:1987 | 07 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,335 | $305 | Implemented |
KU0216 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,533 | $20,000 | Implemented |
KU0216 # 02 Y:1987 | 02 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,014 | $15,000 | Not Implemented |
KU0216 # 03 Y:1987 | 03 | 1987 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $6,934 | $9,000 | Not Implemented |
KU0216 # 04 Y:1987 | 04 | 1987 | INSTALL SET-BACK TIMERS | $2,429 | $683 | Implemented |
KU0216 # 05 Y:1987 | 05 | 1987 | IMPROVE LUBRICATION PRACTICES | $2,386 | $2,250 | Implemented |
KU0216 # 06 Y:1987 | 06 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,562 | $0 | Implemented |
KU0216 # 07 Y:1987 | 07 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,128 | $200 | Not Implemented |
OK0217 # 01 Y:1987 | 01 | 1987 | KEEP LAMPS AND REFLECTORS CLEAN | $1,521 | $4,450 | Not Implemented |
OK0217 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,326 | $2,808 | Implemented |
OK0217 # 03 Y:1987 | 03 | 1987 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,969 | $9,033 | Implemented |
OK0217 # 04 Y:1987 | 04 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,396 | $1,000 | Implemented |
KU0210 # 01 Y:1986 | 01 | 1986 | IMPROVE LUBRICATION PRACTICES | $7,588 | $3,325 | Implemented |
KU0210 # 02 Y:1986 | 02 | 1986 | INSTALL SET-BACK TIMERS | $5,599 | $2,100 | Implemented |
KU0210 # 03 Y:1986 | 03 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,772 | $0 | Implemented |
KU0210 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $876 | $0 | Implemented |
KU0210 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $726 | $1,200 | Not Implemented |
KU0210 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $711 | $40 | Not Implemented |