Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0389 # 01 Y:2009 | 01 | 2009 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,844 | $1,000 | Implemented |
WV0389 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,876 | $5,376 | Not Implemented |
WV0389 # 03 Y:2009 | 03 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,832 | $4,053 | Not Implemented |
WV0389 # 04 Y:2009 | 04 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $4,703 | $662 | Implemented |
WV0389 # 05 Y:2009 | 05 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,461 | $1,740 | Not Implemented |
WV0389 # 06 Y:2009 | 06 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,065 | $8,080 | Not Implemented |
WV0389 # 07 Y:2009 | 07 | 2009 | USE OPTIMUM THICKNESS INSULATION | $2,517 | $960 | Implemented |
WV0389 # 08 Y:2009 | 08 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,947 | $290 | Not Implemented |
WV0389 # 09 Y:2009 | 09 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,740 | $600 | Implemented |
WV0389 # 10 Y:2009 | 10 | 2009 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,613 | $6,810 | Not Implemented |
WV0389 # 11 Y:2009 | 11 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,462 | $2,860 | Implemented |
WV0389 # 12 Y:2009 | 12 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,327 | $0 | Implemented |
WV0389 # 13 Y:2009 | 13 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $962 | $0 | Not Implemented |
WV0389 # 14 Y:2009 | 14 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $526 | $0 | Not Implemented |
LE0285 # 01 Y:2009 | 01 | 2009 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $146,916 | $900,000 | Not Implemented |
LE0285 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,507 | $5,000 | Not Implemented |
LE0285 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,666 | $200 | Not Implemented |
LE0285 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,646 | $2,000 | Not Implemented |
LE0285 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,999 | $12,000 | Not Implemented |
LE0285 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,792 | $800 | Not Implemented |
LE0285 # 07 Y:2009 | 07 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $1,391 | $50 | Implemented |
LE0285 # 08 Y:2009 | 08 | 2009 | INSTALL OCCUPANCY SENSORS | $1,389 | $1,525 | Implemented |
LE0285 # 09 Y:2009 | 09 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $668 | $900 | Not Implemented |
LE0284 # 01 Y:2009 | 01 | 2009 | UPGRADE OBSOLETE EQUIPMENT | $42,827 | $30,000 | Not Implemented |
LE0284 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,473 | $20,000 | Not Implemented |