IAC Assessment: LE0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2010
Principal Product metering motors
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $100,000,000-$500,000,000
# of Employees 212
Plant Area (Sq.Ft.) 100,000
Annual Production 21,000 Units
Production Hrs. Annual 4,680
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,718 2,641,958 kWh $0.07
Electricity Demand $98,032 6,937 kW-months/year $14.13
Natural Gas $23,662 1,112 MMBtu $21.28
TOTAL ENERGY COSTS $305,412
RECOMMENDED SAVINGS* $52,091 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,904
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,029
Cost:
$785
$5,946 84,946 $3,083 218 - - - - $5,946
84,946
kWh
$3,083
218
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,875
Cost:
$1,760
$4,530 64,720 $2,345 166 - - - - $4,530
64,720
kWh
$2,345
166
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,903
Cost:
$3,000
- - $4,903 347 - - - - -
-
kWh
$4,903
347
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,627
Cost:
$66,360
$2,057 29,340 $1,151 82 $1,419 67 - - $2,057
29,340
kWh
$1,151
82
kW-months/year
$1,419
67
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,326
Cost:
$450
$2,326 33,230 - - - - - - $2,326
33,230
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$2,367
Cost:
$4,500
- - - - $2,367 111 - - -
-
kWh
-
-
kW-months/year
$2,367
111
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,239
Cost:
$1,000
$2,239 31,986 - - - - - - $2,239
31,986
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$935
Cost:
$800
$652 9,319 $283 20 - - - - $652
9,319
kWh
$283
20
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,807
Cost:
$55,184
$11,409 162,984 $5,786 409 - - $612 - $11,409
162,984
kWh
$5,786
409
kW-months/year
-
-
MMBtu
$612
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$983
Cost:
$450
$983 14,040 - - - - - - $983
14,040
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,091
Cost:
$134,289
$30,142 430,565 $17,551 1,242 $3,786 178 $612 - $30,142
430,565
kWh
$17,551
1,242
kW-months/year
$3,786
178
MMBtu
$612
-
$
TOTAL IMPLEMENTED Savings:
$15,904
Cost:
$2,545
$10,476 149,666 $5,428 384 - - - - $10,476
149,666
kWh
$5,428
384
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost