IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0431 # 03 Y:1994 03 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,424 $150 Implemented
KU0431 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $312 $500 Implemented
KU0431 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $540 Implemented
KU0431 # 06 Y:1994 06 1994 USE SYNTHETIC LUBRICANT $8,433 $30,600 Implemented
KU0431 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,061 $8,050 Not Implemented
KU0431 # 08 Y:1994 08 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,197 $575 Implemented
KU0431 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,993 $225 Implemented
KU0431 # 10 Y:1994 10 1994 COVER OPEN TANKS $630 $1,056 Not Implemented
MO0122 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,322 $44,473 Implemented
MO0122 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,128 $670 Not Implemented
MO0122 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,101 $609 Not Implemented
MO0122 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $1,817 $368 Implemented
MO0122 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,698 $120 Not Implemented
MO0122 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $883 $137 Not Implemented
MO0122 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $6,595 Implemented
MO0122 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $692 $242 Implemented
OD0005 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $943 $336 Implemented
OD0005 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $692 $302 Not Implemented
OD0005 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,191 $16,710 Not Implemented
OD0005 # 04 Y:1994 04 1994 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $20,090 $3,677 Not Implemented
OD0005 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,595 $5,698 Not Implemented
OD0005 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $179 $97 Implemented
OD0005 # 07 Y:1994 07 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,793 $5,589 Not Implemented
OD0005 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,047 $3,810 Not Implemented
OD0003 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,798 $29,976 Not Implemented