Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0653 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $384 | $0 | Implemented |
GT0653 # 05 Y:1998 | 05 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $865 | $0 | Not Implemented |
GT0653 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $8,980 | $31,660 | Implemented |
GT0653 # 07 Y:1998 | 07 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $370,000 | $100,000 | Implemented |
GT0652 # 01 Y:1998 | 01 | 1998 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $9,935 | $0 | n/a |
GT0652 # 02 Y:1998 | 02 | 1998 | METER WASTE WATER | $6,890 | $1,000 | n/a |
GT0652 # 03 Y:1998 | 03 | 1998 | INSTALL STEAM TRAP | $2,103 | $2,800 | n/a |
GT0652 # 04 Y:1998 | 04 | 1998 | UTILIZE OUTSIDE CONTRACTING | $4,345 | $0 | n/a |
GT0652 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,000 | $250 | n/a |
GT0652 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,300 | $0 | n/a |
GT0652 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,430 | $130,994 | n/a |
GT0647 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,309 | $3,080 | Implemented |
GT0647 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $645 | $2,200 | Implemented |
GT0647 # 03 Y:1998 | 03 | 1998 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $860 | $4,625 | Not Implemented |
GT0647 # 04 Y:1998 | 04 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $430 | $1,992 | Not Implemented |
GT0647 # 05 Y:1998 | 05 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $2,260 | $3,125 | Not Implemented |
GT0651 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,260 | $3,100 | Not Implemented |
GT0651 # 02 Y:1998 | 02 | 1998 | COVER OPEN TANKS | $21,415 | $6,174 | Not Implemented |
GT0651 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,874 | $52,766 | Not Implemented |
GT0651 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $3,933 | Not Implemented |
GT0651 # 05 Y:1998 | 05 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,004 | $413 | Not Implemented |
GT0651 # 06 Y:1998 | 06 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $16,208 | $38,860 | Not Implemented |
GT0651 # 07 Y:1998 | 07 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,099 | $0 | Not Implemented |
GT0651 # 08 Y:1998 | 08 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $105,300 | $120,000 | Not Implemented |
GT0649 # 01 Y:1998 | 01 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $66,324 | $81,400 | Not Implemented |