IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0463 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $500 $400 Implemented
GT0463 # 05 Y:1992 05 1992 REDUCE FLUID FLOW RATES $16,100 $0 Implemented
GT0463 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $141,500 $86,000 Implemented
GT0464 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $10,600 Not Implemented
GT0464 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $6,000 Not Implemented
GT0464 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $247 $375 Not Implemented
GT0464 # 04 Y:1992 04 1992 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $256 $300 Not Implemented
GT0464 # 05 Y:1992 05 1992 REPLACE BOILER $8,120 $18,000 Not Implemented
GT0464 # 06 Y:1992 06 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,680 $23,500 Not Implemented
GT0465 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,785 $67,510 Not Implemented
GT0465 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,990 $500 Not Implemented
GT0465 # 03 Y:1992 03 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $7,940 $6,000 Not Implemented
GT0465 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $440 $40,000 Not Implemented
OK0374 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $1,003 Implemented
OK0374 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,845 $76,172 Implemented
OK0374 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,244 $0 Implemented
OK0374 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,395 $5,750 Implemented
OK0374 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $225 $0 Not Implemented
OK0374 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,673 $7,440 Not Implemented
AS0054 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $125,830 $500,000 Not Implemented
AS0054 # 02 Y:1992 02 1992 USE UTILITY CONTROLLED POWER MANAGEMENT $12,703 $25,000 Implemented
AS0054 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,278 $18,136 Implemented
AS0054 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,936 $1,803 Implemented
AS0054 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15 $147 Implemented
AS0054 # 06 Y:1992 06 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,062 $2,400 Not Implemented