IAC Assessment: GT0464
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0464
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product CAKES AND DESSERTS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 1,100,000 Pieces
Production Hrs. Annual 5,300
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,162 1,039,273 kWh $0.07
Natural Gas $38,374 6,854 MMBtu $5.60
TOTAL ENERGY COSTS $107,536
RECOMMENDED SAVINGS* $25,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,631
Cost:
$10,600
$1,781 26,084 - - $(-150) - $1,781
26,084
kWh
-
-
MMBtu
$(-150)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,670
Cost:
$6,000
$1,670 25,205 - - - - $1,670
25,205
kWh
-
-
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$247
Cost:
$375
$247 3,517 - - - - $247
3,517
kWh
-
-
MMBtu
-
-
$
04: 2.7446 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS Savings:
$256
Cost:
$300
$256 3,810 - - - - $256
3,810
kWh
-
-
MMBtu
-
-
$
05: 2.1224 REPLACE BOILER Savings:
$8,120
Cost:
$18,000
- - $8,120 1,450 - - -
-
kWh
$8,120
1,450
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$13,680
Cost:
$23,500
$13,680 - - - - - $13,680
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$25,604
Cost:
$58,775
$17,634 58,616 $8,120 1,450 $(-150) - $17,634
58,616
kWh
$8,120
1,450
MMBtu
$(-150)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes