Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,130
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0492 # 07 Y:1993 | 07 | 1993 | INSTALL OCCUPANCY SENSORS | $1,450 | $630 | Not Implemented |
GT0492 # 08 Y:1993 | 08 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,990 | $58,000 | Implemented |
GT0492 # 09 Y:1993 | 09 | 1993 | DISCONNECT BALLASTS | $980 | $1,200 | Implemented |
GT0492 # 10 Y:1993 | 10 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,860 | $5,700 | Not Implemented |
ME0106 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,077 | $11,050 | Implemented |
ME0106 # 02 Y:1993 | 02 | 1993 | OPTIMIZE PLANT POWER FACTOR | $2,100 | $3,500 | Not Implemented |
ME0106 # 03 Y:1993 | 03 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,529 | $11,877 | Implemented |
UD0403 # 01 Y:1993 | 01 | 1993 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $17,544 | $50,000 | Implemented |
UD0403 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,715 | $25,000 | Implemented |
UD0403 # 03 Y:1993 | 03 | 1993 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,873 | $202 | Implemented |
UD0403 # 04 Y:1993 | 04 | 1993 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $532 | $250 | Implemented |
KU0398 # 01 Y:1993 | 01 | 1993 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $45,950 | $48,000 | Not Implemented |
KU0398 # 02 Y:1993 | 02 | 1993 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,158 | $19,000 | Not Implemented |
KU0398 # 03 Y:1993 | 03 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,620 | $2,000 | Implemented |
KU0398 # 04 Y:1993 | 04 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,875 | $2,875 | Implemented |
KU0398 # 05 Y:1993 | 05 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,003 | $19,646 | Implemented |
KU0398 # 06 Y:1993 | 06 | 1993 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,349 | $700 | Implemented |
KU0398 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $0 | Implemented |
KU0398 # 08 Y:1993 | 08 | 1993 | USE PHOTOCELL CONTROLS | $835 | $400 | Not Implemented |
KU0398 # 09 Y:1993 | 09 | 1993 | INSTALL OCCUPANCY SENSORS | $769 | $1,260 | Not Implemented |
KU0398 # 10 Y:1993 | 10 | 1993 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $100 | $10 | Implemented |
SF0002 # 01 Y:1993 | 01 | 1993 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,600 | $5,300 | Implemented |
SF0002 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $458 | $200 | Implemented |
SF0002 # 03 Y:1993 | 03 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $793 | $1,150 | Not Implemented |
SF0002 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,211 | $572 | Not Implemented |