IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0492 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $1,450 $630 Not Implemented
GT0492 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,990 $58,000 Implemented
GT0492 # 09 Y:1993 09 1993 DISCONNECT BALLASTS $980 $1,200 Implemented
GT0492 # 10 Y:1993 10 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,860 $5,700 Not Implemented
ME0106 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,077 $11,050 Implemented
ME0106 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $2,100 $3,500 Not Implemented
ME0106 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,529 $11,877 Implemented
UD0403 # 01 Y:1993 01 1993 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $17,544 $50,000 Implemented
UD0403 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,715 $25,000 Implemented
UD0403 # 03 Y:1993 03 1993 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,873 $202 Implemented
UD0403 # 04 Y:1993 04 1993 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $532 $250 Implemented
KU0398 # 01 Y:1993 01 1993 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,950 $48,000 Not Implemented
KU0398 # 02 Y:1993 02 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,158 $19,000 Not Implemented
KU0398 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,620 $2,000 Implemented
KU0398 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,875 $2,875 Implemented
KU0398 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,003 $19,646 Implemented
KU0398 # 06 Y:1993 06 1993 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,349 $700 Implemented
KU0398 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Implemented
KU0398 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $835 $400 Not Implemented
KU0398 # 09 Y:1993 09 1993 INSTALL OCCUPANCY SENSORS $769 $1,260 Not Implemented
KU0398 # 10 Y:1993 10 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $100 $10 Implemented
SF0002 # 01 Y:1993 01 1993 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,600 $5,300 Implemented
SF0002 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $458 $200 Implemented
SF0002 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $793 $1,150 Not Implemented
SF0002 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,211 $572 Not Implemented