IAC Assessment: GT0492
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0492
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1993
Principal Product Synthetic Yarn
NAICS n/a
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 276
Plant Area (Sq.Ft.) 180,000
Annual Production 20,400,000 Pounds
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $663,573 12,633,060 kWh $0.05
Natural Gas $216,188 75,197 MMBtu $2.87
TOTAL ENERGY COSTS $879,761
RECOMMENDED SAVINGS* $71,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,300
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,090
Cost:
$450
- - $1,090 380 -
-
kWh
$1,090
380
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,880
Cost:
$11,800
- - $7,880 2,740 -
-
kWh
$7,880
2,740
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,620
Cost:
$7,280
- - $2,620 912 -
-
kWh
$2,620
912
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$26,920
Cost:
$103,820
$26,920 501,172 - - $26,920
501,172
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,320
Cost:
-
$12,320 223,623 - - $12,320
223,623
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$710
Cost:
$700
$710 13,482 - - $710
13,482
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,450
Cost:
$630
$1,450 27,843 - - $1,450
27,843
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,990
Cost:
$58,000
$15,990 304,807 - - $15,990
304,807
kWh
-
-
MMBtu
09: 2.7122 DISCONNECT BALLASTS Savings:
$980
Cost:
$1,200
$980 18,757 - - $980
18,757
kWh
-
-
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,860
Cost:
$5,700
$1,860 35,463 - - $1,860
35,463
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$71,820
Cost:
$189,580
$60,230 1,125,147 $11,590 4,032 $60,230
1,125,147
kWh
$11,590
4,032
MMBtu
TOTAL IMPLEMENTED Savings:
$57,300
Cost:
$163,470
$56,210 1,048,359 $1,090 380 $56,210
1,048,359
kWh
$1,090
380
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas