Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0032 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,023 | $8,710 | Not Implemented |
KG0032 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,180 | $600 | Implemented |
KG0032 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,008 | $383 | Implemented |
KG0032 # 04 Y:1995 | 04 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $1,002 | $600 | Not Implemented |
KG0032 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $636 | $20 | Not Implemented |
KG0031 # 01 Y:1995 | 01 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,243 | $10,000 | Not Implemented |
KG0031 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,088 | $392 | Not Implemented |
KG0031 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,965 | $2,750 | Implemented |
KG0031 # 04 Y:1995 | 04 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,436 | $1,000 | Not Implemented |
KG0031 # 05 Y:1995 | 05 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $250 | $65 | Implemented |
IA0115 # 01 Y:1995 | 01 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,919 | $0 | Implemented |
IA0115 # 02 Y:1995 | 02 | 1995 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,223 | $8,195 | Not Implemented |
IA0115 # 03 Y:1995 | 03 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,759 | $405 | Implemented |
IA0115 # 04 Y:1995 | 04 | 1995 | INSTALL OCCUPANCY SENSORS | $1,119 | $1,686 | Implemented |
IA0115 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,982 | $1,090 | Implemented |
IA0115 # 06 Y:1995 | 06 | 1995 | USE RADIANT HEATER FOR SPOT HEATING | $894 | $1,050 | Not Implemented |
IA0115 # 07 Y:1995 | 07 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $367 | $194 | Not Implemented |
IA0115 # 08 Y:1995 | 08 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $25 | Implemented |
IA0115 # 09 Y:1995 | 09 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $114 | $105 | Not Implemented |
GT0559 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,650 | $8,020 | Not Implemented |
GT0559 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,740 | $2,470 | Not Implemented |
GT0559 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,240 | $500 | Implemented |
GT0559 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,510 | $28,740 | Implemented |
GT0559 # 05 Y:1995 | 05 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,210 | $13,650 | Not Implemented |
GT0559 # 06 Y:1995 | 06 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,050 | $1,500 | Implemented |