Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0434 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,921 | $65,000 | Not Implemented |
LE0434 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,129 | $5,350 | Not Implemented |
LE0434 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $483 | $1,450 | Implemented |
LE0434 # 08 Y:2017 | 08 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,523 | $40,000 | Not Implemented |
TT0188 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $23,768 | $97,975 | Not Implemented |
TT0188 # 02 Y:2017 | 02 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $10,583 | $100 | Implemented |
TT0188 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,331 | $8,433 | Not Implemented |
TT0188 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,153 | $890 | Implemented |
TT0188 # 05 Y:2017 | 05 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $684 | $450 | Not Implemented |
WV0543 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,860 | $17,381 | Implemented |
WV0543 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,251 | $8,510 | Implemented |
WV0543 # 03 Y:2017 | 03 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,081 | $0 | Not Implemented |
WV0543 # 04 Y:2017 | 04 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,688 | $1,000 | Not Implemented |
WV0543 # 05 Y:2017 | 05 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,262 | $839 | Not Implemented |
WV0543 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,457 | $5,365 | Not Implemented |
WV0543 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,262 | $256 | Implemented |
WV0543 # 08 Y:2017 | 08 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $988 | $1,050 | Not Implemented |
WV0543 # 09 Y:2017 | 09 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $755 | $542 | Implemented |
WV0543 # 10 Y:2017 | 10 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $39 | Implemented |
WV0543 # 11 Y:2017 | 11 | 2017 | INSTALL SET-BACK TIMERS | $164 | $765 | Not Implemented |
MZ0222 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,645 | $5,229 | Implemented |
MZ0222 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $247 | $260 | Implemented |
MZ0222 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $97 | $190 | Implemented |
MZ0222 # 04 Y:2017 | 04 | 2017 | MINIMIZE WATER USAGE | $90 | $35 | Implemented |
MZ0222 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $267 | $0 | Implemented |