IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0434 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,921 $65,000 Not Implemented
LE0434 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,129 $5,350 Not Implemented
LE0434 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $1,450 Implemented
LE0434 # 08 Y:2017 08 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,523 $40,000 Not Implemented
TT0188 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $23,768 $97,975 Not Implemented
TT0188 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $10,583 $100 Implemented
TT0188 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,331 $8,433 Not Implemented
TT0188 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,153 $890 Implemented
TT0188 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $684 $450 Not Implemented
WV0543 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,860 $17,381 Implemented
WV0543 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,251 $8,510 Implemented
WV0543 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,081 $0 Not Implemented
WV0543 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,688 $1,000 Not Implemented
WV0543 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,262 $839 Not Implemented
WV0543 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,457 $5,365 Not Implemented
WV0543 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,262 $256 Implemented
WV0543 # 08 Y:2017 08 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $988 $1,050 Not Implemented
WV0543 # 09 Y:2017 09 2017 DEVELOP A REPAIR/REPLACE POLICY $755 $542 Implemented
WV0543 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $39 Implemented
WV0543 # 11 Y:2017 11 2017 INSTALL SET-BACK TIMERS $164 $765 Not Implemented
MZ0222 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,645 $5,229 Implemented
MZ0222 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $247 $260 Implemented
MZ0222 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $97 $190 Implemented
MZ0222 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $90 $35 Implemented
MZ0222 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $0 Implemented