IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0347 # 01 Y:1991 01 1991 REDUCE GLAZED AREAS IN BUILDINGS $749 $2,720 Not Implemented
UD0347 # 02 Y:1991 02 1991 REDUCE GLAZED AREAS IN BUILDINGS $4,856 $6,150 Not Implemented
UD0347 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,824 $0 Not Implemented
UD0347 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $568 $1,000 Not Implemented
UD0347 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $683 $0 Not Implemented
TN0423 # 01 Y:1991 01 1991 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $224,192 $0 Not Implemented
TN0423 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,443 $2,415 Not Implemented
TN0423 # 03 Y:1991 03 1991 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $974 $285 Not Implemented
TN0423 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $310 $0 Not Implemented
TN0423 # 05 Y:1991 05 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,200 $13,500 Not Implemented
TN0423 # 06 Y:1991 06 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,130 $0 Not Implemented
UD0344 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $16,902 $5,000 Implemented
UD0344 # 02 Y:1991 02 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $20,762 $0 Implemented
UD0344 # 03 Y:1991 03 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,492 $0 Implemented
UD0344 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,529 $0 Implemented
TN0426 # 01 Y:1991 01 1991 USE MINIMUM STEAM OPERATING PRESSURE $10,911 $500 Implemented
TN0426 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,789 $1,000 Implemented
TN0426 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $897 $25 Implemented
TN0426 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $327 $45 Implemented
TN0426 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $400 Implemented
TN0426 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $940 Implemented
TN0426 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $556 Implemented
TN0426 # 08 Y:1991 08 1991 OPTIMIZE PLANT POWER FACTOR $803 $1,375 Implemented
TN0428 # 01 Y:1991 01 1991 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $217,463 $0 Not Implemented
TN0428 # 02 Y:1991 02 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $361 $984 Not Implemented