Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0382 # 07 Y:2008 | 07 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,784 | $224 | Not Implemented |
WV0382 # 08 Y:2008 | 08 | 2008 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $4,689 | $996 | Implemented |
WV0382 # 09 Y:2008 | 09 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,240 | $1,000 | Not Implemented |
WV0382 # 10 Y:2008 | 10 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,383 | $4,160 | Not Implemented |
WV0382 # 11 Y:2008 | 11 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,016 | $195 | Implemented |
WV0382 # 12 Y:2008 | 12 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,884 | $3,093 | Not Implemented |
WV0382 # 13 Y:2008 | 13 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,076 | $31 | Implemented |
WV0382 # 14 Y:2008 | 14 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $902 | $0 | Implemented |
WV0382 # 15 Y:2008 | 15 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $766 | $3,539 | Implemented |
DL0020 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $55,000 | $30,000 | Not Implemented |
DL0020 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $29,300 | $125,000 | Not Implemented |
DL0020 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,000 | $13,700 | Not Implemented |
DL0020 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,334 | $34,037 | Implemented |
DL0020 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $740 | $350 | Implemented |
DL0020 # 06 Y:2008 | 06 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $63 | $130 | Not Implemented |
LE0275 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,241 | $20,000 | Not Implemented |
LE0275 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,646 | $6,020 | Implemented |
LE0275 # 03 Y:2008 | 03 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,225 | $1,800 | Implemented |
LE0275 # 04 Y:2008 | 04 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $9,912 | $5,250 | Not Implemented |
LE0275 # 05 Y:2008 | 05 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,781 | $2,200 | Not Implemented |
LE0275 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,675 | $1,000 | Implemented |
LE0275 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,495 | $11,500 | Not Implemented |
LE0275 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $5,121 | $300 | Implemented |
LE0275 # 09 Y:2008 | 09 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,949 | $4,000 | Not Implemented |
LE0275 # 10 Y:2008 | 10 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,664 | $50 | Implemented |