IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0149 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $485 $220 Implemented
AS0149 # 09 Y:1995 09 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,285 $54,010 Not Implemented
AM0248 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $9,500 $2,930 Implemented
AM0248 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $8,584 $8,750 Not Implemented
AM0248 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,020 $290 Implemented
AM0248 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $200 Implemented
AM0248 # 05 Y:1995 05 1995 UPGRADE OBSOLETE EQUIPMENT $790 $655 Implemented
AM0248 # 06 Y:1995 06 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $350 $0 Implemented
AM0248 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $310 $500 Implemented
AM0248 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $38,980 $40,000 Implemented
AM0248 # 09 Y:1995 09 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,550 $19,700 Implemented
AM0248 # 10 Y:1995 10 1995 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $340 $0 Implemented
WI0241 # 01 Y:1995 01 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,790 $880 Not Implemented
WI0241 # 02 Y:1995 02 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,075 $3,720 Not Implemented
WI0241 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,028 $1,850 Implemented
WI0241 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $473 $210 Implemented
WI0241 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $208 $160 Not Implemented
WI0241 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $166 $75 Not Implemented
TN0551 # 01 Y:1995 01 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $5,639 $2,700 Not Implemented
TN0551 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $3,753 $790 Not Implemented
TN0551 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,133 $1,410 Implemented
TN0551 # 04 Y:1995 04 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $623 $0 Implemented
TN0551 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $164 $520 Not Implemented
UD0460 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $41,888 $30,000 Implemented
UD0460 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,025 $0 Not Implemented