IAC logo
IAC Assessment: UD0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product plastic injection molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 40,000
Annual Production 0 Units
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $284,285 4,674,971 kWh $0.06
Natural Gas $9,570 1,903 MMBtu $5.03
TOTAL ENERGY COSTS $293,855
RECOMMENDED SAVINGS* $58,311 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,870
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$41,888
Cost:
$30,000
$41,888 - - - - - $41,888
-
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,025
Cost:
-
$11,025 321,512 - - - - $11,025
321,512
kWh
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,416
Cost:
$3,000
- - $1,416 283 - - -
-
kWh
$1,416
283
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,670
Cost:
$5,216
$1,458 26,377 - - $212 - $1,458
26,377
kWh
-
-
MMBtu
$212
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,312
Cost:
$4,077
$2,312 37,808 - - - - $2,312
37,808
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$58,311
Cost:
$42,293
$56,683 385,697 $1,416 283 $212 - $56,683
385,697
kWh
$1,416
283
MMBtu
$212
-
$
TOTAL IMPLEMENTED Savings:
$45,870
Cost:
$39,293
$45,658 64,185 - - $212 - $45,658
64,185
kWh
-
-
MMBtu
$212
-
$