IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0428 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $11,136 $0 Not Implemented
TN0428 # 04 Y:1991 04 1991 KEEP LAMPS AND REFLECTORS CLEAN $8,847 $0 Not Implemented
TN0428 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $73 $75 Not Implemented
TN0428 # 06 Y:1991 06 1991 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,021 $500 Not Implemented
TN0428 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $742 $510 Not Implemented
TN0428 # 08 Y:1991 08 1991 IMPROVE LUBRICATION PRACTICES $634 $2,100 Not Implemented
TN0428 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,578 $451 Not Implemented
TN0428 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $660 Not Implemented
TN0428 # 11 Y:1991 11 1991 OPTIMIZE PLANT POWER FACTOR $3,912 $5,900 Not Implemented
TN0414 # 01 Y:1990 01 1990 REPAIR AND ELIMINATE STEAM LEAKS $2,941 $500 Implemented
TN0414 # 02 Y:1990 02 1990 KEEP LAMPS AND REFLECTORS CLEAN $11,964 $0 Not Implemented
TN0414 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,891 $1,405 Implemented
TN0414 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,019 $3,000 Implemented
TN0414 # 05 Y:1990 05 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $810 $0 Implemented
TN0414 # 06 Y:1990 06 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $641 $200 Implemented
TN0414 # 07 Y:1990 07 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $862 $480 Implemented
TN0414 # 08 Y:1990 08 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $732 $0 Implemented
UD0330 # 01 Y:1990 01 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,879 $0 Not Implemented
UD0330 # 02 Y:1990 02 1990 RECOVER AND REUSE COOLING WATER $8,744 $10,000 Not Implemented
UD0330 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,017 $15,000 Implemented
UD0330 # 04 Y:1990 04 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,681 $500 Not Implemented
UD0330 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $5,716 $1,500 Not Implemented
TN0396 # 01 Y:1990 01 1990 KEEP LAMPS AND REFLECTORS CLEAN $5,135 $19,742 Not Implemented
TN0396 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $770 $1,025 Implemented
TN0396 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,635 $0 Not Implemented