IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0555 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $442 Implemented
TN0555 # 09 Y:1995 09 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,409 $0 Implemented
TN0554 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $5,277 $19,760 Not Implemented
TN0554 # 02 Y:1995 02 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,636 $680 Implemented
TN0554 # 03 Y:1995 03 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,379 $3,800 Implemented
TN0554 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $343 $820 Not Implemented
TN0554 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $431 $990 Not Implemented
TN0554 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,625 $0 Implemented
TN0554 # 07 Y:1995 07 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,046 $0 Not Implemented
TN0553 # 01 Y:1995 01 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $810 $0 Implemented
TN0553 # 02 Y:1995 02 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,313 $1,320 Implemented
TN0553 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $853 $0 Implemented
TN0553 # 04 Y:1995 04 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,284 $20,800 Not Implemented
TN0552 # 01 Y:1995 01 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,410 $0 Implemented
TN0552 # 02 Y:1995 02 1995 AIR CONDITION ONLY SPACE NECESSARY $7,953 $0 Not Implemented
TN0552 # 03 Y:1995 03 1995 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,137 $0 Implemented
TN0552 # 04 Y:1995 04 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $3,312 $0 Implemented
TN0552 # 05 Y:1995 05 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $607 $1,700 Not Implemented
TN0552 # 06 Y:1995 06 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $318 $0 Implemented
TN0552 # 07 Y:1995 07 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,469 $0 Not Implemented
TN0565 # 01 Y:1995 01 1995 USE OPTIMUM TEMPERATURE $17,434 $0 n/a
TN0565 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,599 $2,500 n/a
TN0565 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,865 $9,000 n/a
TN0565 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,713 $1,750 n/a
TN0565 # 05 Y:1995 05 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,517 $800 n/a