IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0464 # 04 Y:2016 04 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $736 $150 Implemented
UM0464 # 05 Y:2016 05 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,107 $7,900 Implemented
UA0156 # 01 Y:2016 01 2016 INSULATE FEEDWATER TANK $34,968 $50,000 Implemented
UA0156 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,495 $82,466 Implemented
UA0156 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,024 $6,995 Not Implemented
UA0156 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $28,560 $700 Implemented
UA0156 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,817 $1,000 Not Implemented
BS0070 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $13,590 $12,584 Implemented
BS0070 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,026 $744 Implemented
BS0070 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $2,153 $213 Implemented
BS0070 # 04 Y:2016 04 2016 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,079 $4,500 Implemented
BS0070 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $418 $14 Implemented
BS0070 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $585 Implemented
BS0070 # 07 Y:2016 07 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $161 $43 Implemented
BS0070 # 08 Y:2016 08 2016 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $9,918 $88,300 Not Implemented
NC0564 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $84,927 $200 Not Implemented
NC0564 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,556 $36,876 Implemented
NC0564 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,668 $27,490 Implemented
NC0564 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $910 $2,559 Implemented
NC0564 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $425 $1,071 Implemented
NC0564 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,735 $300 Implemented
NC0564 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $100 Not Implemented
NC0564 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $3,168 $5,865 Not Implemented
NC0564 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,030 $230 Implemented
TT0168 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $10,893 $19,250 Not Implemented