IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0272 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $1,098 Implemented
IC0272 # 04 Y:2023 04 2023 AIR CONDITION ONLY SPACE NECESSARY $647 $0 Implemented
IC0272 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $341 $35 Implemented
IC0271 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,828 $2,808 Implemented
IC0271 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,279 $6,000 Not Implemented
IC0271 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $5,419 $1,598 Implemented
IC0270 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $300 Implemented
IC0270 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $82 $440 Implemented
IC0270 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $369 $400 Not Implemented
IC0270 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,786 $106 Implemented
IC0269 # 01 Y:2022 01 2022 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,336 $10,000 Not Implemented
IC0269 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,128 $3,969 Implemented
IC0269 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $29,469 $62,532 Not Implemented
IC0267 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,764 $12,282 Not Implemented
IC0267 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,427 $97 Not Implemented
IC0267 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,543 $7,600 Implemented
IC0268 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $591 $1,330 Implemented
IC0268 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,935 $205 Not Implemented
IC0268 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,827 $7,200 Implemented
IC0268 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $315 $1,040 Implemented
IC0266 # 01 Y:2022 01 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $5,894 $58,751 Not Implemented
IC0266 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $34 $64 Implemented
IC0266 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $186 $260 Implemented
IC0266 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $565 $450 Implemented
IC0265 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,567 $5,100 Implemented