Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
625
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0340 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,630 | $44,639 | Implemented |
MI0340 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,892 | $24,640 | Implemented |
MI0340 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,112 | $2,475 | Not Implemented |
MI0340 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,618 | $12,938 | Implemented |
MI0340 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $6,724 | $17,025 | Not Implemented |
MI0340 # 08 Y:2018 | 08 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,909 | $17,222 | Not Implemented |
MI0340 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,288 | $80 | Not Implemented |
MI0339 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,225,133 | $10,935,180 | Implemented |
MI0339 # 02 Y:2018 | 02 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $279,023 | $250,000 | Not Implemented |
MI0339 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $254,041 | $3,280 | Not Implemented |
MI0339 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95,116 | $69,861 | Implemented |
MI0339 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $47,520 | $480 | Not Implemented |
MI0339 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,278 | $2,030 | Implemented |
MI0339 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $28,281 | $41,300 | Not Implemented |
MI0339 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $11,795 | $9,000 | Not Implemented |
MI0338 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,077 | $3,280 | Not Implemented |
MI0338 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,126 | $12,487 | Not Implemented |
MI0338 # 03 Y:2018 | 03 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,231 | $10,979 | Not Implemented |
MI0338 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $7,395 | $10,000 | Not Implemented |
MI0338 # 05 Y:2018 | 05 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,623 | $12,700 | Not Implemented |
MI0338 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $3,272 | $2,295 | Not Implemented |
MI0338 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,201 | $3,628 | Not Implemented |
MI0338 # 08 Y:2018 | 08 | 2018 | USE PHOTOCELL CONTROLS | $1,130 | $1,376 | Not Implemented |
MI0329 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,609 | $40 | Implemented |
MI0329 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,815 | $1,746 | Not Implemented |