IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0326 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,633 $9,000 Not Implemented
KU0326 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $2,295 $520 Not Implemented
KU0326 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $706 $520 Implemented
KU0326 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $100 Implemented
KU0326 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $317 $100 Implemented
KU0326 # 07 Y:1990 07 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $708 $0 Implemented
KU0326 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $293 $0 Not Implemented
KU0326 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49 $30 Not Implemented
KU0326 # 10 Y:1990 10 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
KU0327 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,470 $1,250 Implemented
KU0327 # 02 Y:1990 02 1990 INSULATE BARE EQUIPMENT $5,349 $12,000 Implemented
KU0327 # 03 Y:1990 03 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,611 $3,400 Implemented
KU0327 # 04 Y:1990 04 1990 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,567 $987 Not Implemented
KU0327 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $2,509 $3,000 Implemented
KU0327 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,487 $2,600 Implemented
KU0327 # 07 Y:1990 07 1990 INSTALL SET-BACK TIMERS $1,982 $2,300 Not Implemented
KU0327 # 08 Y:1990 08 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,480 $2,400 Implemented
KU0327 # 09 Y:1990 09 1990 ISOLATE HOT OR COLD EQUIPMENT $1,337 $355 Implemented
KU0327 # 10 Y:1990 10 1990 DISCONNECT BALLASTS $178 $300 Not Implemented
KU0327 # 11 Y:1990 11 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $178 $0 Implemented
KU0328 # 01 Y:1990 01 1990 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $4,413 $8,400 Not Implemented
KU0328 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,273 $3,200 Not Implemented
KU0328 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,446 $420 Not Implemented
KU0328 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,181 $150 Not Implemented
KU0328 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $723 $600 Not Implemented