IAC logo
IAC Assessment: KU0327
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0327
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1990
Principal Product GARMENTS
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales n/a
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 152,476 Pieces
Production Hrs. Annual 3,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,217 2,354,045 kWh $0.06
Natural Gas $33,310 7,682 MMBtu $4.34
TOTAL ENERGY COSTS $176,527
RECOMMENDED SAVINGS* $29,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,421
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$7,470
Cost:
$1,250
$7,470 122,802 - - $7,470
122,802
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,349
Cost:
$12,000
$5,349 87,925 - - $5,349
87,925
kWh
-
-
MMBtu
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,611
Cost:
$3,400
- - $3,611 832 -
-
kWh
$3,611
832
MMBtu
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$2,567
Cost:
$987
$2,567 42,204 - - $2,567
42,204
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,509
Cost:
$3,000
$1,550 25,498 $959 221 $1,550
25,498
kWh
$959
221
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,487
Cost:
$2,600
- - $2,487 573 -
-
kWh
$2,487
573
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,982
Cost:
$2,300
$1,982 32,532 - - $1,982
32,532
kWh
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,480
Cost:
$2,400
$1,480 24,326 - - $1,480
24,326
kWh
-
-
MMBtu
09: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,337
Cost:
$355
$1,337 21,981 - - $1,337
21,981
kWh
-
-
MMBtu
10: 2.7122 DISCONNECT BALLASTS Savings:
$178
Cost:
$300
$178 2,931 - - $178
2,931
kWh
-
-
MMBtu
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$178
Cost:
-
$178 2,931 - - $178
2,931
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,148
Cost:
$28,592
$22,091 363,130 $7,057 1,626 $22,091
363,130
kWh
$7,057
1,626
MMBtu
TOTAL IMPLEMENTED Savings:
$24,421
Cost:
$25,005
$17,364 285,463 $7,057 1,626 $17,364
285,463
kWh
$7,057
1,626
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas