IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0250 # 06 Y:1995 06 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,770 $0 Not Implemented
UF0134 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,418 $10,501 Not Implemented
UF0134 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,083 $5,832 Not Implemented
UF0134 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,277 $4,277 Not Implemented
UF0134 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,009 $38,849 Not Implemented
UF0134 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,519 $350 Not Implemented
UF0134 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $1,000 $1,200 Not Implemented
UF0134 # 07 Y:1995 07 1995 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,056 $18,750 Not Implemented
UF0134 # 08 Y:1995 08 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,960 $3,650 Not Implemented
AR0074 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $584 Implemented
AR0074 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,013 $14,650 Implemented
AR0074 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,864 $350 Implemented
AR0074 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,547 $25 Implemented
AR0074 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $5,669 $13,220 Not Implemented
AR0074 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,091 $55,000 Not Implemented
AR0074 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $408 $0 Implemented
AR0074 # 08 Y:1995 08 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $18,582 $500 Implemented
AR0074 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,696 $200 Implemented
AR0074 # 10 Y:1995 10 1995 MAINTAIN MACHINES TO REDUCE LEAKS $3,240 $1,000 Implemented
ME0175 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,395 $6,300 Not Implemented
ME0175 # 02 Y:1995 02 1995 REPAIR OR REPLACE STEAM TRAPS $12,145 $9,600 Implemented
ME0175 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,381 $11,381 Implemented
ME0175 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,892 $7,000 Not Implemented
ME0175 # 05 Y:1995 05 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,561 $778 Implemented
ME0175 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,317 $400 Implemented