Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | Rubber tires |
NAICS | n/a |
SIC | 3011 - Tires And Inner Tubes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 42,000 |
Annual Production | 450,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $311,027 | 3,149,766 | kWh | $0.10 |
LPG | $20,465 | 2,868 | MMBtu | $7.14 |
Fuel Oil #6 | $163,059 | 54,844 | MMBtu | $2.97 |
TOTAL ENERGY COSTS | $494,551 | |||
RECOMMENDED SAVINGS* | $59,838 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,436 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $14,395 Cost: $6,300 |
$15,059 | 151,817 | - | - | $(-664) | (-222) | - | - | - | - |
$15,059 151,817 kWh |
- - MMBtu |
$(-664) (-222) MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $12,145 Cost: $9,600 |
- | - | - | - | $12,145 | 3,867 | - | - | - | - |
- - kWh |
- - MMBtu |
$12,145 3,867 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,381 Cost: $11,381 |
$3,381 | 38,101 | - | - | - | - | - | - | - | - |
$3,381 38,101 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,892 Cost: $7,000 |
$4,652 | 28,722 | $(-760) | (-122) | - | - | - | - | - | - |
$4,652 28,722 kWh |
$(-760) (-122) MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,561 Cost: $778 |
- | - | - | - | $2,561 | 1,067 | - | - | - | - |
- - kWh |
- - MMBtu |
$2,561 1,067 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,317 Cost: $400 |
- | - | - | - | $2,317 | 775 | - | - | - | - |
- - kWh |
- - MMBtu |
$2,317 775 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $1,093 Cost: - |
- | - | - | - | - | - | $1,093 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$1,093 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $563 Cost: - |
- | - | - | - | - | - | $563 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$563 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2123 INSULATE FEEDWATER TANK |
Savings: $260 Cost: $270 |
- | - | - | - | $260 | 87 | - | - | - | - |
- - kWh |
- - MMBtu |
$260 87 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2514 COVER OPEN TANKS |
Savings: $209 Cost: $195 |
$209 | 2,931 | - | - | - | - | - | - | - | - |
$209 2,931 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $19,022 Cost: $24,200 |
- | - | - | - | - | - | - | - | $19,022 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
$19,022 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,838 Cost: $60,124 |
$23,301 | 221,571 | $(-760) | (-122) | $16,619 | 5,574 | $1,656 | - | $19,022 | - | $23,301 221,571 kWh |
$(-760) (-122) MMBtu |
$16,619 5,574 MMBtu |
$1,656 - $ |
$19,022 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,436 Cost: $22,624 |
$3,590 | 41,032 | - | - | $17,283 | 5,796 | $563 | - | - | - | $3,590 41,032 kWh |
- - MMBtu |
$17,283 5,796 MMBtu |
$563 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Water Consumption |