IAC Assessment: ME0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Rubber tires
NAICS n/a
SIC 3011 - Tires And Inner Tubes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 42,000
Annual Production 450,000 Pieces
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,027 3,149,766 kWh $0.10
LPG $20,465 2,868 MMBtu $7.14
Fuel Oil #6 $163,059 54,844 MMBtu $2.97
TOTAL ENERGY COSTS $494,551
RECOMMENDED SAVINGS* $59,838 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,436
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Water Consumption Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Water Consumption
$ kWh $ MMBtu $ MMBtu $ $ $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,395
Cost:
$6,300
$15,059 151,817 - - $(-664) (-222) - - - - $15,059
151,817
kWh
-
-
MMBtu
$(-664)
(-222)
MMBtu
-
-
$
-
-
Tgal
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$12,145
Cost:
$9,600
- - - - $12,145 3,867 - - - - -
-
kWh
-
-
MMBtu
$12,145
3,867
MMBtu
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,381
Cost:
$11,381
$3,381 38,101 - - - - - - - - $3,381
38,101
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,892
Cost:
$7,000
$4,652 28,722 $(-760) (-122) - - - - - - $4,652
28,722
kWh
$(-760)
(-122)
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,561
Cost:
$778
- - - - $2,561 1,067 - - - - -
-
kWh
-
-
MMBtu
$2,561
1,067
MMBtu
-
-
$
-
-
Tgal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,317
Cost:
$400
- - - - $2,317 775 - - - - -
-
kWh
-
-
MMBtu
$2,317
775
MMBtu
-
-
$
-
-
Tgal
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,093
Cost:
-
- - - - - - $1,093 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$1,093
-
$
-
-
Tgal
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$563
Cost:
-
- - - - - - $563 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$563
-
$
-
-
Tgal
09: 2.2123 INSULATE FEEDWATER TANK Savings:
$260
Cost:
$270
- - - - $260 87 - - - - -
-
kWh
-
-
MMBtu
$260
87
MMBtu
-
-
$
-
-
Tgal
10: 2.2514 COVER OPEN TANKS Savings:
$209
Cost:
$195
$209 2,931 - - - - - - - - $209
2,931
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
Tgal
11: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$19,022
Cost:
$24,200
- - - - - - - - $19,022 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$19,022
-
Tgal
TOTAL RECOMMENDED Savings:
$59,838
Cost:
$60,124
$23,301 221,571 $(-760) (-122) $16,619 5,574 $1,656 - $19,022 - $23,301
221,571
kWh
$(-760)
(-122)
MMBtu
$16,619
5,574
MMBtu
$1,656
-
$
$19,022
-
Tgal
TOTAL IMPLEMENTED Savings:
$21,436
Cost:
$22,624
$3,590 41,032 - - $17,283 5,796 $563 - - - $3,590
41,032
kWh
-
-
MMBtu
$17,283
5,796
MMBtu
$563
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ Tgal
Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Water Consumption Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Water Consumption