IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0429 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $209 Implemented
GT0429 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $1,130 Implemented
GT0429 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $1,600 Implemented
GT0429 # 04 Y:1991 04 1991 REDUCE GLAZED AREAS IN BUILDINGS $1,806 $10,500 Implemented
GT0427 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $3,987 Implemented
GT0427 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $1,060 $0 Implemented
GT0427 # 03 Y:1991 03 1991 RECOVER AND REUSE COOLING WATER $8,140 $11,000 Implemented
GT0427 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,280 $2,000 Implemented
GT0428 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $429 $0 Implemented
GT0428 # 02 Y:1991 02 1991 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $562 $400 Implemented
GT0428 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,500 Implemented
GT0428 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,170 $2,400 Implemented
GT0428 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $839 Implemented
GT0428 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $68 $563 Implemented
GT0428 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $70 $0 Implemented
GT0428 # 08 Y:1991 08 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,160 $600 Implemented
OR0107 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,674 $10,500 Implemented
OR0107 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,622 $10,000 Implemented
OR0107 # 05 Y:1991 05 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $10,621 $0 Implemented
OR0107 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $330 $420 Implemented
OR0107 # 07 Y:1991 07 1991 OPTIMIZE PLANT POWER FACTOR $996 $2,550 Implemented
OR0107 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $1,475 Implemented
OR0108 # 01 Y:1991 01 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $615 $0 Implemented
OR0108 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,129 $500 Implemented
OR0108 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $2,482 $4,030 Implemented