IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0179 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $2,293 $2,325 Implemented
AS0179 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,398 $20,641 Implemented
AS0179 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,504 $18,900 Not Implemented
AS0179 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $1,142 $2,455 Not Implemented
AS0177 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $0 Not Implemented
AS0177 # 02 Y:1996 02 1996 ADD AREA LIGHTING SWITCHES $1,982 $0 Not Implemented
AS0177 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $660 $900 Not Implemented
AS0177 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,531 $13,132 Not Implemented
AS0177 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $390 Not Implemented
AS0177 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $444 $180 Implemented
AS0177 # 07 Y:1996 07 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,289 $8,800 Not Implemented
AS0177 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,920 $0 Not Implemented
AS0178 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $224 $0 Implemented
AS0178 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,169 $0 Implemented
AS0178 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,213 $40 Implemented
AS0178 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,756 $300 Not Implemented
AS0178 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $144 $240 Not Implemented
AS0178 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $2,076 $975 Implemented
AS0178 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,920 $18,749 Implemented
AS0178 # 08 Y:1996 08 1996 REDUCE VENTILATION AIR $2,059 $980 Not Implemented
AS0178 # 09 Y:1996 09 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,510 $0 Implemented
AS0178 # 10 Y:1996 10 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,212 $4,000 Not Implemented
AS0178 # 11 Y:1996 11 1996 INSTALL TIMERS AND/OR THERMOSTATS $746 $1,600 Not Implemented
AS0178 # 12 Y:1996 12 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,455 $0 Implemented
AS0176 # 01 Y:1996 01 1996 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,963 $450 n/a