IAC logo
IAC Assessment: AS0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Potato and Corn Chip Snacks
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 180,000
Annual Production 25,000 Tons
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $529,187 8,423,798 kWh $0.06
Electricity Demand $27,454 14,070 kW-months/year $1.95
TOTAL ENERGY COSTS $844,814
RECOMMENDED SAVINGS* $36,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,882
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,388
Cost:
$10,000
$6,879 145,955 $509 275 - - $6,879
145,955
kWh
$509
275
kW-months/year
-
-
Tgal
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,466
Cost:
$4,200
$7,229 153,283 $1,237 669 - - $7,229
153,283
kWh
$1,237
669
kW-months/year
-
-
Tgal
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$932
Cost:
$2,080
$932 19,930 - - - - $932
19,930
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$119
Cost:
$115
$113 2,345 $6 3 - - $113
2,345
kWh
$6
3
kW-months/year
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,795
Cost:
$6,778
$8,228 174,678 $567 306 - - $8,228
174,678
kWh
$567
306
kW-months/year
-
-
Tgal
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$2,455
Cost:
$3,500
$3,234 80,305 $407 220 $(-1,186) (-727,834) $3,234
80,305
kWh
$407
220
kW-months/year
$(-1,186)
(-727,834)
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$283
Cost:
-
$266 5,569 $17 9 - - $266
5,569
kWh
$17
9
kW-months/year
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,148
Cost:
$5,730
$1,010 21,395 $138 74 - - $1,010
21,395
kWh
$138
74
kW-months/year
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,607
Cost:
$26,161
$6,090 129,250 $517 280 - - $6,090
129,250
kWh
$517
280
kW-months/year
-
-
Tgal
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$96
Cost:
$100
- - - - $96 58,752 -
-
kWh
-
-
kW-months/year
$96
58,752
Tgal
TOTAL RECOMMENDED Savings:
$36,289
Cost:
$58,664
$33,981 732,710 $3,398 1,836 $(-1,090) (-669,082) $33,981
732,710
kWh
$3,398
1,836
kW-months/year
$(-1,090)
(-669,082)
Tgal
TOTAL IMPLEMENTED Savings:
$16,882
Cost:
$16,380
$15,040 319,168 $1,746 944 $96 58,752 $15,040
319,168
kWh
$1,746
944
kW-months/year
$96
58,752
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal