Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0128 # 08 Y:1991 | 08 | 1991 | OPTIMIZE PLANT POWER FACTOR | $308 | $750 | Implemented |
OR0129 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,102 | $0 | Implemented |
OR0129 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,277 | $0 | Implemented |
OR0129 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,236 | $30,000 | Implemented |
OR0129 # 04 Y:1991 | 04 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,626 | $0 | Implemented |
OR0129 # 05 Y:1991 | 05 | 1991 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,068 | $3,066 | Implemented |
OR0129 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,072 | $0 | Implemented |
OR0129 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,573 | $40,000 | Implemented |
OR0129 # 08 Y:1991 | 08 | 1991 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $522 | $864 | Implemented |
OR0129 # 09 Y:1991 | 09 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $790 | $1,430 | Implemented |
OR0129 # 10 Y:1991 | 10 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,172 | $0 | Implemented |
OR0129 # 11 Y:1991 | 11 | 1991 | OPTIMIZE PLANT POWER FACTOR | $12,146 | $26,250 | Implemented |
OR0129 # 12 Y:1991 | 12 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $952 | $2,150 | Implemented |
OR0129 # 13 Y:1991 | 13 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,521 | $15,000 | Implemented |
OR0129 # 14 Y:1991 | 14 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,227 | $64,975 | Implemented |
OR0130 # 01 Y:1991 | 01 | 1991 | INSTALL SET-BACK TIMERS | $1,778 | $225 | Implemented |
OR0130 # 02 Y:1991 | 02 | 1991 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $261 | $0 | Implemented |
OR0130 # 03 Y:1991 | 03 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $450 | $800 | Implemented |
OR0130 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,399 | $4,936 | Implemented |
OR0130 # 05 Y:1991 | 05 | 1991 | OPTIMIZE PLANT POWER FACTOR | $1,647 | $3,450 | Implemented |
OR0130 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $75 | $157 | Implemented |
OR0130 # 07 Y:1991 | 07 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,347 | $3,453 | Implemented |
OR0130 # 08 Y:1991 | 08 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $292 | $881 | Implemented |
OR0121 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $2,788 | $1,800 | Implemented |
OR0121 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $1,153 | $1,112 | Implemented |