IAC Assessment: OR0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product PINE PARTICLE BOARD
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 0
Annual Production 166,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,359,013 35,362,251 kWh $0.04
Natural Gas $142,414 37,872 MMBtu $3.76
Wood $488,380 397,056 MMBtu $1.23
TOTAL ENERGY COSTS $1,989,807
RECOMMENDED SAVINGS* $69,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,141
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$538
Cost:
-
$538 12,603 - - - - $538
12,603
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,349
Cost:
-
$2,867 74,443 - - $(-518) - $2,867
74,443
kWh
-
-
MMBtu
$(-518)
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,452
Cost:
$20,250
$9,452 - - - - - $9,452
-
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,689
Cost:
$5,934
$1,689 42,790 - - - - $1,689
42,790
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,962
Cost:
$14,175
$2,962 78,253 - - - - $2,962
78,253
kWh
-
-
MMBtu
-
-
$
06: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$52,401
Cost:
-
$158,814 4,381,301 $(-53,853) (-13,554) $(-52,560) - $158,814
4,381,301
kWh
$(-53,853)
(-13,554)
MMBtu
$(-52,560)
-
$
TOTAL RECOMMENDED Savings:
$69,391
Cost:
$40,359
$176,322 4,589,390 $(-53,853) (-13,554) $(-53,078) - $176,322
4,589,390
kWh
$(-53,853)
(-13,554)
MMBtu
$(-53,078)
-
$
TOTAL IMPLEMENTED Savings:
$11,141
Cost:
$26,184
$11,141 42,790 - - - - $11,141
42,790
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes