IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0405 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,041 $580 Not Implemented
MI0405 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,954 $3,600 Implemented
MI0405 # 06 Y:2022 06 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $874 $900 Not Implemented
WV0621 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $12,269 $21,859 Implemented
WV0621 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,862 $48,343 Not Implemented
WV0621 # 03 Y:2022 03 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,354 $20,540 Not Implemented
WV0621 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,686 $23,557 Not Implemented
WV0621 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,366 $465 Implemented
WV0621 # 06 Y:2022 06 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,888 $18,000 Not Implemented
WV0621 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,302 $2,408 Implemented
WV0621 # 08 Y:2022 08 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,675 $3,980 Not Implemented
WV0621 # 09 Y:2022 09 2022 UPGRADE CONTROLS ON COMPRESSORS $1,010 $4,122 Implemented
WV0621 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $601 $98 Implemented
WV0621 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $596 $2,747 Implemented
WV0621 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $1,321 Not Implemented
WV0621 # 13 Y:2022 13 2022 DEVELOP A REPAIR/REPLACE POLICY $412 $1,761 Implemented
WV0621 # 14 Y:2022 14 2022 INSULATE BARE EQUIPMENT $139 $325 Implemented
AM0845 # 01 Y:2022 01 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $50,900 $9,100 Implemented
AM0845 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,965 $13,500 Implemented
AM0845 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $9,077 $27,090 Implemented
AM0845 # 04 Y:2022 04 2022 PAY UTILITY BILLS ON TIME $1,114 $0 Implemented
AM0845 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $649 $360 Implemented
AM0845 # 06 Y:2022 06 2022 USE SYNTHETIC LUBRICANT $302 $700 Implemented
AM0845 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,709 $15,704 Implemented
AS0517 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,690 $126,497 Not Implemented