IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0401 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,860 $1,920 n/a
WI0401 # 10 Y:2001 10 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,339 $2,000 n/a
WI0400 # 01 Y:2001 01 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $104,000 $4,000 Not Implemented
WI0400 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,857 $10,000 Not Implemented
WI0400 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,503 $1,500 Not Implemented
WI0400 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $3,744 Not Implemented
WI0400 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $211 $300 Not Implemented
WI0400 # 06 Y:2001 06 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,277 $0 Not Implemented
WI0400 # 07 Y:2001 07 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $738 $2,000 Not Implemented
WI0400 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $640 Implemented
WI0400 # 09 Y:2001 09 2001 INSTALL TIMERS AND/OR THERMOSTATS $209 $400 Implemented
WI0399 # 01 Y:2001 01 2001 INSTALL TIMERS AND/OR THERMOSTATS $31,173 $2,000 Not Implemented
WI0399 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,170 $8,874 Not Implemented
WI0399 # 03 Y:2001 03 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $24,740 $0 Not Implemented
WI0399 # 04 Y:2001 04 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,208 $4,500 Not Implemented
WI0399 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,894 $62,046 Not Implemented
WI0399 # 06 Y:2001 06 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,914 $4,000 Not Implemented
WI0399 # 07 Y:2001 07 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $6,301 $0 Not Implemented
WI0399 # 08 Y:2001 08 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,805 $11,500 Not Implemented
WI0399 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,549 $0 Not Implemented
WI0399 # 10 Y:2001 10 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,149 $2,009 Not Implemented
WI0398 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $129,888 $20,000 Not Implemented
WI0398 # 02 Y:2001 02 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $120,634 $360,000 Not Implemented
WI0398 # 03 Y:2001 03 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $116,146 $630,000 Not Implemented
WI0398 # 04 Y:2001 04 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,467 $18,150 Not Implemented