IAC logo
IAC Assessment: WI0407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product Clutches
NAICS n/a
SIC 3449 - Miscellaneous Metal Work
Sales $5,000,000-$10,000,000
# of Employees 57
Plant Area (Sq.Ft.) 48,000
Annual Production 580,000 Pieces
Production Hrs. Annual 4,900
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,920 896,880 kWh $0.06
Electricity Demand $10,704 1,038 kW-months/year $10.31
Electricity Fees $4,595 - $ -
Natural Gas $25,256 3,021 MMBtu $8.36
TOTAL ENERGY COSTS $104,443
RECOMMENDED SAVINGS* $47,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$26,600
Cost:
-
- - - - - - - - - - $26,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$26,600
-
$
-
-
$
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$6,632
Cost:
$12,000
- - - - - - $9,100 1,925 $(-476) (-610) $(-741) - - - $(-1,251) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,100
1,925
gal
$(-476)
(-610)
lb
$(-741)
-
$
-
-
$
$(-1,251)
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,562
Cost:
$100
$4,562 115,200 - - - - - - - - - - - - - - $4,562
115,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,796
Cost:
$3,760
$(-62) (-1,574) - - $3,858 462 - - - - - - - - - - $(-62)
(-1,574)
kWh
-
-
kW-months/year
$3,858
462
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,274
Cost:
$600
- - - - $4,274 511 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,274
511
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$751
Cost:
-
- - - - - - - - - - - - $751 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$751
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$486
Cost:
$640
$323 8,153 $163 15 - - - - - - - - - - - - $323
8,153
kWh
$163
15
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$289
Cost:
-
$192 4,857 $97 9 - - - - - - - - - - - - $192
4,857
kWh
$97
9
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,390
Cost:
$17,100
$5,015 126,636 $260 24 $8,132 973 $9,100 1,925 $(-476) (-610) $25,859 - $751 - $(-1,251) - $5,015
126,636
kWh
$260
24
kW-months/year
$8,132
973
MMBtu
$9,100
1,925
gal
$(-476)
(-610)
lb
$25,859
-
$
$751
-
$
$(-1,251)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material