IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0174 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $378 $916 Implemented
OR0174 # 04 Y:1993 04 1993 OPTIMIZE PLANT POWER FACTOR $3,112 $3,750 Not Implemented
OR0174 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $1,000 Implemented
MA0273 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $35,663 $30,400 Implemented
MA0273 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,496 $22,778 Not Implemented
MA0273 # 03 Y:1993 03 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,038 $0 Not Implemented
MA0273 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $712 Not Implemented
MA0273 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $520 $120 Implemented
MA0273 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $26 $6 Implemented
AM0181 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $3,000 $6,000 Implemented
AM0181 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $9,440 Implemented
AM0181 # 03 Y:1993 03 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,042 $2,250 Not Implemented
AM0181 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $820 $420 Implemented
AM0182 # 01 Y:1993 01 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $94,480 $0 Not Implemented
AM0182 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,800 $600 Implemented
AM0182 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $16,650 $46,600 Not Implemented
AM0182 # 04 Y:1993 04 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,070 $0 Implemented
AM0182 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $200 $413 Implemented
ND0152 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $341 $2,000 Not Implemented
ND0152 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,901 $1,982 Not Implemented
ND0152 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $1,154 $800 Not Implemented
ND0152 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $850 $590 Not Implemented
ND0152 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $400 Not Implemented
ND0152 # 06 Y:1993 06 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,103 $918 Not Implemented
ND0152 # 07 Y:1993 07 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $304 $1,085 Not Implemented