IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0327 # 02 Y:1998 02 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,343 $0 Not Implemented
WI0327 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $4,466 $7,200 Not Implemented
WI0327 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,266 $9,500 Not Implemented
WI0327 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $528 $800 Implemented
WI0327 # 06 Y:1998 06 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,573 $590 Implemented
WI0327 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $701 $0 Not Implemented
WI0327 # 08 Y:1998 08 1998 DISCONNECT BALLASTS $487 $0 Not Implemented
UL0197 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $8,627 $8,912 Not Implemented
UL0197 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $503 $400 Not Implemented
UL0197 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $938 $20 Not Implemented
UL0197 # 04 Y:1998 04 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $10,824 $1,700 Implemented
UL0197 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,512 $0 Implemented
UL0197 # 06 Y:1998 06 1998 WASH AND REUSE RAGS ON-SITE $2,925 $4,500 Implemented
BD0118 # 01 Y:1998 01 1998 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $32,188 $123,000 Implemented
BD0118 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,395 $1,500 Not Implemented
BD0118 # 03 Y:1998 03 1998 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,711 $2,400 Not Implemented
BD0118 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,529 $3,580 Not Implemented
BD0118 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,186 $700 Implemented
BD0118 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $957 $800 Implemented
BD0118 # 07 Y:1998 07 1998 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $880 $750 Not Implemented
BD0118 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $350 Implemented
BD0118 # 09 Y:1998 09 1998 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $755 $300 Not Implemented
BD0118 # 10 Y:1998 10 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Implemented
BD0118 # 11 Y:1998 11 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $450 Implemented
BD0118 # 12 Y:1998 12 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $374 $360 Implemented